Not every job needs a full truck. A footing repair, a shed pad, a set of steps, an equipment base or a short run of sidewalk might take one or two yards, and plenty of suppliers make that awkward to order. Short load concrete delivery is a normal part of what we do, and Southern Readymix batches from a single cubic yard.
Small orders carry a flat minimum load fee of $150 on any delivery of seven cubic yards or less. It is quoted up front rather than buried in a per-yard price, because knowing it before you order is usually the difference between planning a job properly and guessing at it.
If you have been told elsewhere that your pour is too small to be worth delivering, that is not how we schedule. Short load concrete delivery is a standing part of the operation across all eight plants.
Not sure how many yards your slab needs? Our concrete slab calculator shows it by size and thickness, so you know if you are in short load range.
We deliver from a single cubic yard. Footing repairs, shed pads, steps and equipment bases are routine short load concrete delivery orders, not favours.
Deliveries of seven cubic yards or less carry a flat $150 minimum load fee. Flat, not per yard, and quoted before you order.
A full load on our mixers is nine to ten cubic yards. Above seven yards there is no minimum load fee at all.
Short load concrete delivery is batched to the same mix design and the same quality control as a full one. Small order, identical standard.
A full load on our mixers is nine to ten cubic yards. Anything at or under seven yards is a short load and carries the flat minimum load fee. Between seven and ten yards you are into ordinary full-load territory with no additional charge.
The smallest order we will deliver is one cubic yard. That is a genuine minimum, not a discouragement. One yard covers roughly a 10 by 10 foot slab at 3.5 inches, a short line of footings, or a modest equipment pad, and those jobs get the same mix design, the same quality control and the same driver as a ten yard pour.
There is also no point at which we would tell you to order more than you need. Some suppliers push customers up to a full load to avoid handling a small one. We do not. If the job takes three yards, order three yards.
Put simply, short load concrete delivery means any order at or under seven cubic yards. It is a routine part of our batching schedule, not an exception we work around.
Knowing where the threshold sits is the practical value of understanding short load concrete delivery before you order, because it tells you whether the fee applies to your pour. For how the total is figured, read our guide to concrete price per yard.
A truck, a driver, a wash-out and a slot on the batch schedule cost the same whether the drum is carrying two yards or ten. The minimum load fee covers that fixed cost on orders where the yardage alone does not.
It is charged as a flat $150 rather than as a rising per-yard surcharge, which matters more than it first appears. A per-yard structure penalises you hardest at exactly the point the order is smallest. A flat fee does not move, so a one yard order and a six yard order carry the same charge, and the effective cost per yard falls steadily as the order grows toward the seven yard threshold.
For most small residential work the fee is a modest share of the total job cost, and considerably cheaper than the alternative of mixing several dozen bags by hand and hoping the batches match. Bagged concrete mixed on site varies from batch to batch in water content, and on anything structural that variation shows up as inconsistent strength.
The flat structure is what makes short load concrete delivery predictable to budget. You know the fee before the truck is booked, and it does not move if the pour turns out smaller than you planned.
Ordering short is the expensive mistake. A second truck sent out for the last half yard costs far more than the extra yard would have, and a cold joint where the first load stiffened before the second arrived is a defect you live with for the life of the slab.
Our concrete calculator sizes slabs, footings and columns and adds a waste allowance, which is the part most people leave out. Formwork bulges, subgrade is never perfectly level, and some always spills. Rounding up to the next quarter yard is standard practice, not over-ordering.
If you would rather not work it out yourself, give dispatch the dimensions rather than a yardage and let them size it with you. It takes a minute on the phone and it is a great deal cheaper than being short.
Sizing matters more on a small pour than a large one, because the margin for error is thinner. Getting the yardage right is most of what makes short load concrete delivery go smoothly on the day.
Dispatch would rather size the order with you than send a second truck. That conversation is a normal part of booking short load concrete delivery.
Need less than a full truck? We deliver short loads from eight Georgia plants, starting at one cubic yard. Orders of seven cubic yards or less carry a flat $150 minimum load fee. Call (770) 914-9700 with your address and yardage and dispatch will confirm the nearest plant and your total.
Short loads start at one cubic yard.
Deliveries of seven cubic yards or less carry a flat $150 minimum load fee. A full load is nine to ten yards.
Call (770) 914-9700 with your address and yardage, or request a short load quote online.
Ordering a short load is no different from ordering a full one. Dispatch needs the volume in cubic yards, the strength in psi, the slump you want at the chute, the pour date with a time window, and how the truck will reach the forms.
Most small residential loads go out at 3000 psi at roughly a 4 inch slump, which suits footings, pads and light slabs. Say so when you order if your plans call for something different, and mention anything that changes the pour such as fiber reinforcement or a pump on site.
Site access is worth raising when you order rather than on the day. A short load still arrives on a full-size mixer, so the truck needs the same room to get in, turn and wash out that a ten yard delivery would.
Short loads are batched at the same eight plants as everything else, in Locust Grove, Hampton, Jackson, Covington, Madison, Zebulon, Luthersville and Auburn, with one dispatch desk covering all eight. That coverage matters more on a small order than a large one, because a short haul keeps working time in the mix. Call 770-914-9700, use the contact form, or see the network on the plant locations page. For full-load ordering, see ready mix concrete delivery.
For background on how ready mixed concrete is produced and specified in the United States, the National Ready Mixed Concrete Association publishes guidance for contractors and specifiers. For anything specific to short load concrete delivery in Georgia, dispatch is the faster answer.
Southern Readymix has handled short load concrete delivery across the trade area since 2014, and the small pours get the same batching discipline as the large ones.
Whatever the size of the pour, short load concrete delivery is quoted, batched and delivered on the same terms as every other load we run.