Work out how many cubic yards your pour needs, see which of our eight Georgia plants is closest, and get a line you can read straight to dispatch. Estimates only, but they will get you close before you call.
Ordering ready mix without a firm number is how a job ends up half a truck short or a full yard long. This concrete calculator covers the three shapes behind most pours in Georgia: slabs and driveways, footings and walls, and round columns. Enter your dimensions, choose whether to carry a waste allowance, and you get a cubic yard figure plus an order figure rounded up to the next quarter yard.
Each shape uses a slightly different formula, and the concrete calculator applies the right one for whichever you pick. Run your dimensions through it below, then call dispatch with a yardage instead of a guess. Once you have a yardage, our guide to concrete price per yard explains what shapes your quote.
Estimates only. Confirm yardage, strength and slump with dispatch before you pour. Short loads are available so a small job is not billed as a full truck.
The calculator above handles any shape. If you already know what you are pouring, the pages below are built for that job, with size tables, measuring tips and bag counts to match. Every one rounds your yardage up to the quarter yard, the way an order is written up.

Patios, driveways, garage floors and sheds. Enter length, width and thickness, then check the 4, 5 and 6 inch size table.

Footings and foundation walls. Enter total length, width and depth, with a size table for common footings at 50, 100 and 150 feet.
Round columns, steps and other shapes are in the calculator above.
Yardage is one line on the ticket. Dispatch also needs the strength the plans call for, stated in psi at 28 days, and the slump that suits how you are placing, whether that is off the chute, by buggy or through a pump. A driveway and a structural footing are not the same order even when the volume matches.
Then the logistics. The job address with a cross street or gate code, the pour date, the time you want the first truck, and how fast your crew can place. On a multi truck pour that placement rate is what sets the interval between trucks, so an honest number beats an optimistic one.
Say something about access while you are on the phone. A loaded mixer is heavy and it does not float. Soft ground, a narrow gate, low limbs, a septic field or a fresh curb cut all change the plan, and they are cheaper to solve before the truck is loaded than after it is buried to the axle.

Every concrete calculator starts with the same three numbers: length, width and depth. The math is simple once the units match. Multiply length by width by thickness in feet, then divide by 27, because a cubic yard is 27 cubic feet. Thickness is almost always given in inches, so divide it by 12 before you multiply. A 20 foot by 10 foot slab poured at 4 inches works out to 66.7 cubic feet, or 2.47 cubic yards.
Footings and walls follow the same rule with two of the dimensions in inches, so a footing measured in feet of run gets its width and depth divided by 12 first. Round columns use the area of a circle instead: multiply pi by the radius squared, then by the height, then divide by 27. A single 12 inch column rarely justifies its own truck, which is why the concrete calculator above lets you enter a column count and totals them together.
The concrete calculator handles all three shapes, but it can only work with the numbers you give it. A concrete calculator is only as good as the tape measure behind it, so measure the forms after they are set rather than working from the plan sheet, and check subgrade depth in several places across the pad. An uneven subgrade is the most common reason a pour that was calculated correctly still comes up short.

Thickness drives the total more than any other input, so set the depth in the concrete calculator to the specified thickness rather than the thickness you hope to pour. Four inches is the common depth for residential patios, walkways and light driveways. Five to six inches is typical where pickups, trailers or delivery vans park, and commercial drives and loading areas usually go deeper with reinforcement set by the engineer. Adding a single inch to a 1,000 square foot slab adds roughly three cubic yards, so confirm the specified depth before you order rather than after the truck is on site.
The 10 percent waste allowance covers the concrete that never makes it into the finished pour: spillage at the chute, over-excavation in soft spots, forms that bowed under load, and the material used to prime a pump line. Ten percent is a working figure for typical flatwork on a prepared subgrade. Rough or wet ground, hand-dug footings and pours over uneven fill can run higher, and the allowance is a toggle so you can compare both numbers.
The concrete calculator rounds the order figure up to the next quarter yard because that is how ready mix is batched and billed. Coming up half a yard short means a second truck, a second delivery charge and a cold joint where the two loads meet, while ordering slightly long costs a fraction of a yard. That trade is why a concrete calculator built for Georgia contractors should always round up rather than down.
Pouring a patio, driveway or garage floor? Our concrete slab calculator includes size tables for 4, 5 and 6 inch slabs.
Pouring a footing or foundation wall? Our concrete footing calculator gives the yards for any footing length, width and depth.

Yardage is the first line on the ticket, not the whole ticket. Once you have a number from the concrete calculator, dispatch needs the strength in psi, the slump you want at the chute, any fiber or admixture the specification calls for, the pour date with a time window, and how the truck will reach the forms. Site access decides whether the load goes down a chute, into a buggy, or through a concrete pump, and that changes both the schedule and the waste factor.
Southern Readymix batches from eight plants across Henry, Butts, Meriwether, Newton, Pike, Morgan and Barrow counties, and one dispatch desk covers all of them. Haul time affects slump and working time, something no concrete calculator can account for, so haul time matters and working time in the drum, so the concrete calculator points you at the nearest plant and we route your load from the yard closest to the job rather than the yard closest to our office. Addresses and phone numbers for every plant are on the plant locations page.
To check your numbers against an independent source, the National Ready Mixed Concrete Association publishes guidance on mix design, placement, and hot and cold weather concreting. For anything specific to your slab, call the dispatch desk at 770-914-9700 and we will work through it with you.

Yardage tells the plant how much to batch. Strength and slump tell it what to batch. Compressive strength is specified in psi and measured on cylinders broken at 28 days. Residential flatwork commonly calls for 3,000 to 3,500 psi, driveways and garage floors often run 3,500 to 4,000 psi, and structural or heavy industrial work goes higher on the engineer specification. When a plan sheet or an inspector gives you a psi figure, use it rather than a rule of thumb, because the mix design changes the cement content and the price per yard.
Slump measures how far fresh concrete settles in a standard cone, and it describes workability rather than quality. A stiffer mix in the 3 to 4 inch range holds its shape on a slope and finishes tight. A wetter mix in the 5 to 6 inch range flows into congested rebar and around tight forms. Adding water on site to loosen a load lowers strength and invites cracking, so the better move is to specify the slump you want when you order, or ask about a water reducing admixture that improves flow without adding water.
Fiber, air entrainment and accelerators belong in the same conversation. Air entrainment matters for anything exposed to freeze and thaw cycles. Fiber reduces plastic shrinkage cracking in flatwork. Accelerators help a late season pour set before temperatures drop. None of these change the yardage the concrete calculator returns, but every one of them changes what the ticket says, so describe the job conditions when you call.
A concrete calculator assumes the ground under your pour sits exactly where the plan says it does. Field conditions rarely cooperate. Soft spots, wheel ruts left by equipment and over excavated footings all pull extra concrete, and across a large slab that difference shows up as a partial second truck. Compact and grade the subgrade, check depth on a grid across the pad rather than only at the edges, and set screed pins so the finishing crew has a reference. Where the subgrade is questionable, take the waste allowance on the high side and plan the last truck as a short load.
Weather changes the schedule more often than it changes the quantity. In Georgia summer heat concrete stiffens faster, so earlier start times, shaded staging and a wet cure plan all help. Placing on a hot, dry, windy day with no curing plan is a common cause of surface cracking. In late fall and winter, cold ground slows the set and a pour may need a longer finishing window or an accelerator. Rain is the one condition that should stop a pour rather than adjust it, because water landing on a fresh surface ruins the finish.
Two logistics items round out the order. Confirm truck access first, because a standard mixer needs firm ground and overhead clearance, and if it cannot reach the forms you are looking at a pump, a buggy or a wheelbarrow crew. Then decide where the truck will wash out before it arrives. Washout has to happen somewhere on the site, and nobody wants that decision made in the moment.
It gives you a solid working estimate from your dimensions. It does not know your subgrade, your forms or how flat the pad really is, so treat the figure as a starting point and confirm the final yardage with dispatch at 770-914-9700.
The concrete calculator uses the same formula a batch plant uses, so the number it returns matches what dispatch would work out by hand.
Because subgrade is never perfectly flat, forms move a little, and some concrete is always left in the drum and the chute. Ten percent is a common allowance. You can switch it off if you have already built waste into your dimensions.
Concrete is batched and billed in increments, so rounding up to the next quarter yard matches how the order is actually written. Coming up short mid pour is far more expensive than a little extra.
Rounding up inside the concrete calculator is deliberate, because a short load costs far more than a small surplus.
No. Short loads are available, so a patio, a shed pad, a sidewalk section or a repair is not billed as a full truck. Give dispatch the dimensions and we will work the yardage with you.
Usually the closest one, because a shorter haul means the concrete arrives with more working time in it. Pick your county in the calculator to see the nearest yard, or call 770-914-9700 and we will confirm which of the eight plants is loading fastest for your date.
Call 770-914-9700 with your yardage, the strength on the plans and a pour date and dispatch will confirm the mix, the plant and the delivery window. You can also email info@southernreadymix.com. See all eight Georgia plants to find the yard nearest your site.
Have a figure from the concrete calculator already? Call the dispatch desk and we will confirm the mix, the slump and the delivery window.